Under-Sink and Countertop Systems

How to Install an Under-Sink Reverse Osmosis System

Step-by-step guide to installing an under-sink RO system: shutting off the cold line, mounting the faucet and tank, the drain connection, and the first flush.

On this page
  1. Before you start: code, space, and tools
  2. Step 1: Shut off the cold water
  3. Step 2: Install the dedicated faucet
  4. Step 3: Connect the cold supply
  5. Step 4: Connect the drain
  6. Step 5: Set up the tank
  7. Step 6: Install filters and membrane
  8. Step 7: Connect the tubing
  9. Step 8: Start up, flush, and check for leaks
  10. Common problems
  11. When to call a plumber

Before you start: code, space, and tools

Check two things before you buy tools. First, check your local plumbing code. Many areas require an air gap or an approved backflow device on the RO drain, and some do not allow a drain saddle at all. Ask your local inspector or permit office, and read our air gap faucet guide if the answer is unclear. Second, measure the cabinet. You need room for the filter housings, the membrane, and the tank, with clearance below to change filters.

Gather the tools you will need:

  • an adjustable wrench and a towel or bucket
  • a drill and the bit size listed in your manual for the faucet hole
  • PTFE (plumber’s) tape for the tank threads
  • a tubing cutter or sharp utility knife
  • a flashlight for leak checks

Step 1: Shut off the cold water

Turn off the cold water supply valve under the sink. Open the kitchen faucet to release the pressure and drain the line. Leave the faucet open until the flow stops.

Step 2: Install the dedicated faucet

If the sink or countertop has no spare hole, such as a soap dispenser hole, drill one. Check the manual for the size. Many kits use a hole around 7/16 inch or 1 inch, but your model’s manual governs. Insert the faucet stem through the hole with its washers, then tighten the locking nut from underneath.

Step 3: Connect the cold supply

Remove the original cold line from the angle stop valve and install the feed-water adapter or tee valve that comes with the kit. Reconnect the original line to the top of the adapter. Connect the RO feed tube to the adapter’s quick-connect or compression fitting. Tighten a compression fitting firmly, but not so far that it cracks.

Step 4: Connect the drain

The drain is the step that most depends on code. The usual method is a drain saddle clamped to the drain pipe above the P-trap. Drill the small hole through the pipe through the saddle, then push the RO’s drain tube into the saddle’s fitting.

Do not install a drain saddle until you have confirmed it is allowed where you live. If your code requires an air gap, use an air gap faucet or a code-approved drain fitting instead. Some installers discover this only after the install, which is why the code check comes first.

Step 5: Set up the tank

Wrap PTFE tape around the tank’s threaded nipple, in the direction of the threads, typically about six to eight wraps. Screw the tank’s shutoff valve on by hand, then snug it with a wrench if needed. Do not over-tighten plastic fittings.

Check the tank’s air pre-charge while the tank is empty. Most manufacturers call for about 5 to 7 psi. If the reading is low, add air with a bicycle pump. For more on sizing and pre-charge, see our under-sink tank size guide.

Step 6: Install filters and membrane

Install the sediment and carbon pre-filters into their housings and tighten the housings by hand, then with the tool the manual specifies. Install the RO membrane in its housing with the arrow or orientation mark as the manual describes. Install the post-filter last, and check that each housing’s O-ring is seated.

Step 7: Connect the tubing

Most kits use color-coded tubing. Connect the feed tube from the cold adapter to the system inlet, the tank tube to the tank port, the purified-water tube from the filter outlet to the faucet, and the drain tube to the saddle or air gap fitting. Cut each tube square and push it fully into the fitting. Tug each fitting gently to make sure it has locked.

Step 8: Start up, flush, and check for leaks

Turn the cold supply back on slowly. Open the tank valve and check every fitting with a flashlight. Dry the fittings with a towel and check again after a few minutes.

Then flush the system. The first tank may take two to three hours to fill. Drain the first full tank through the faucet to clear carbon fines and manufacturing residue. Let a second tank fill before you drink the water. Check the taste and clarity, then use the water for drinking and cooking.

Common problems

  • A leak at a push-to-connect fitting. Pull the tube out, re-cut the end square, and push it back in until it seats.
  • Water tastes or smells odd during the first days. Keep flushing. If it persists, check the filter dates and the installation order.
  • Slow flow to the faucet. Check that the feed valve is fully open and the tank valve is open. A new membrane can take time to reach full output.
  • The tank does not fill. Check the feed line and the tank valve before you assume a membrane fault.

When to call a plumber

Call a licensed plumber if the drain connection is not allowed without an air gap and you cannot fit one, if you need a new drain line or a new faucet hole in a difficult surface such as stone, or if a leak continues after you have re-seated the fittings. A plumber can also confirm the installation meets local code.

For a comparison of the systems that these steps fit, see drinking water filtration systems compared. For the filter schedule after installation, see how to change the filters in an under-sink RO system.

The complete guide to under-sink and countertop systems

Drinking Water Filtration Systems Compared: Under-Sink and Countertop
Read the guide

Keep exploring

Guides from other topics

All topics →